Every Civil Engineering Project Have Its Own Unique Characteristics. the Success of Project
Based on Good Returns In Less Financial Investment. the Engineer Must Take a Determination on How Best
To Achieve the Desired Goals Required By Providing a Workable Solution For Each Project Encountered. If
Any Stage Ground Improvement Required, It Would Not Be Impact any Negative. Ground Improvement Shall
Help Positively to Make Success of Project. the Results of any Ground Improvement Technique Shall Be
Give Required Safe Stable Ground, Minimum Financial Impact, Less Time Period and No Disturbance To
Existing Establishment, Not Additional Material Need to Procure Etc.
The Marine Soil or Soft Soil Present In Approximately 19 Hector Area Near Haji Ali Stretch. the Main 8 Arm
Interchange Are Coming In Same Part. There For Heavy Foundation Required Stable Ground at Least 20.00
Tm2 Bearing Capacity. the Required Bearing Capacity Can’T Achieve In Such Critical Area. Hence Ground
Improvement Required. After Improvement Technic Mentioning Required to Confirm the Settlement. Study
The Various Construction Method Adopting For Improve the Soil or Ground. Every Method Had It’S Own
Pros and Cons, Which Will Help to Decide the Most Suitable Method For Problematic Soil to Improve Its
Capacity. So It Can Be Available to Carry Each Type of Civil Engineering Structures. Selection of Method
Based on Situation and Required Results, Here Are Taken Case Study of Coastal Road Project. Project
Duration and ...